Bathrooms are the most demanding room to tile. There is water on the floor, steam on the walls, a toilet flange to work around and usually very little space for cuts to hide. We tile bathrooms of every size across the GTA, from a powder room floor to a fully tiled ensuite.
What we tile
- Bathroom floors, including heated floors
- Tub surrounds and walk-in showers
- Full-height wall tile and feature walls
- Vanity backsplashes and niches
How long it takes
| Scope | Typical time |
|---|---|
| Bathroom floor | 2–3 days |
| Tub surround retile | 3–4 days |
| Full tiled shower | 4–7 days |
Pricing is confirmed after a free visit. For a ballpark, try the tile cost calculator.
Slip resistance matters here
Bathroom floors get walked on wet. We check that the tile meets DCOF 0.42 or higher before installing. Small mosaic on a shower floor adds grip because of the extra grout lines.
Need the whole bathroom done?
If the job includes vanity, toilet and fixtures as well as tile, see bathroom renovation.